Announcement of Beijing Municipal Bureau of Ecological Environment
No. 3, 2019
Announcement of Beijing Municipal Bureau of Ecological Environment
on the Detailed Implementation Rules of Beijing Municipality for Classified Management Catalogue of Environmental Impact Assessment of Construction Projects (2018)
In accordance with the Environmental Impact Assessment Law of the People's Republic of China, Regulations on the Administration of Construction Project Environmental Protection, Classified Management Catalogue of Environmental Impact Assessment of Construction Projects (former No. 44 decree of Ministry of Environmental Protection, hereinafter, "Classified Management Catalogue") and the requirements of Decision on Amending Some Contents of Classified Management Catalogue of Environmental Impact Assessment of Construction Projects (No. 1 decree of Ministry of Ecological Environment) (hereinafter, the Amendment List), we hereby formulate the Announcement of Beijing Municipal Bureau of Ecological Environment on the Detailed Implementation Rules of Beijing Municipality for Classified Management Catalogue of Environmental Impact Assessment of Construction Projects (2018) (hereinafter, the Detailed Rules", see the Appendix for details), with a view to implementing the reform of "streamlining administrative procedures, delegating powers to lower levels, combining decentralization with control, and optimizing services" and further optimizing the business environment. Upon the filing with Ministry of Ecological Environment, it is hereby issued for effect as of March 1, 2019.
I. The construction units shall strictly draft the environmental impact assessment documents for construction projects in accordance with the requirements of Classified Management Catalogue, Amendment List and Detailed Rules, and shall not change the categories of environmental impact assessment without authorization.
II. The categories of items listed in the Detailed Rules shall be implemented in accordance with the relevant requirements of the Detailed Rules. Unless otherwise not listed in the Detailed Rules, it shall be subject to the Classified Management Catalogue and Amendment List.
III. Items not listed in the Classified Management Catalogue, Amendment List and Detailed Rules shall not be included into the environment impact assessment for construction projects in principle. For emerging industries, if the ecological environment department at the district level considers that such industries shall be included into the environmental impact assessment, the district bureau will propose suggestion in line with the environmental impact characteristics of the construction projects and we will report to Ministry of Ecological Environment for ratification.
IV. Construction projects listed in Classified Management Catalogue, Amendment List and Detailed Rules, if only related to supporting facilities, public works and auxiliary projects, the types of EIA documents can be determined according to supporting facilities, public works and auxiliary projects.
V. According to the environmental impact of construction projects and the sensitivity of surrounding environment, the requirements for special evaluation of engineering analysis, water, atmosphere, noise and environmental risk are put forward in the Detailed Rules. For matters not stated in the Detailed Rules, if the ecological environment department at the district level considers it necessary to carry out a special evaluation, it shall be put forward by the ecological environmental department at the district level and report to our bureau for the record.
It is hereby announced.
Appendix: The Detailed Implementation Rules of Beijing Municipality for Classified Management Catalogue of Environmental Impact Assessment of Construction Projects
(2018)
Beijing Municipal Bureau of Ecological Environment
February 12, 2019
(This document is made public voluntarily)
Appendix
The Detailed Implementation Rules of Beijing Municipality for Classified Management Catalogue of Environmental Impact Assessment of Construction Projects
(2018)
Environmental Impact Assessment Category Project Type | Report | Report Sheet | Registration Form | Definition of Environmental Sensitive Area | Special Items of Report Sheet Assessment Requirements | |
XIII. Manufacturing of cultural & educational, arts & crafts, sports and entertainment products | ||||||
31 | Cultural & educational, sports and entertainment products | / | All (including advertising production projects with spray painting) | / | ||
XV. Manufacturing of Chemical Materials and Chemicals | ||||||
36 | Manufacture of basic chemical raw materials; pesticide manufacturing; manufacture of coatings, dyes, pigments, inks and similar products; manufacture of synthetic materials; manufacture of special chemicals; manufacture of explosives, pyrotechnics and fireworks products; manufacture of water treatment agents, etc. |
New construction, expansion and technical renovation of main installations (Except for pure mixing and sub-packing) |
Others | / | Risk assessment (Manufacturing of oily coatings, oily dyes, oily pigments, oily inks and similar products) | |
39 | Manufacturing of daily chemicals
| New construction, expansion and technical renovation of main installations (Except for pure mixing and sub-packing) | Others | / | ||
XVI. Pharmaceutical manufacturing industry | ||||||
40 | Chemicals manufacturing; biological and biochemical products manufacturing | New construction, expansion and technical renovation of main installations | Others | / | ||
XVII. Chemical Fiber Manufacturing Industry | ||||||
44 | Chemical fiber manufacturing | New construction, expansion and technical renovation of main installations (Except for pure spinning) | Others | / | ||
XXV. Automotive industry | ||||||
71 | Automotive industry | Vehicle manufacturing (excluding assembly only); engine production; parts and components with plating or spraying process and annual paint volume (containing diluent) at and more than 10 tons | Others | / | Engineering analysis and evaluation (Involving organic coatings (without powder spraying or plastic spraying) | |
XXVI. Manufacturing of railway, ship, aerospace and other transportation equipment | ||||||
72 | Manufacture and repair of railway transportation equipment | Manufacture of locomotives, vehicles and EMUs; engine production; parts and components with electroplating or spraying process and annual paint volume (containing diluent) at and more than 10 tons | Others | / | Engineering analysis and evaluation (Involving organic coatings (without powder spraying or plastic spraying) | |
74 | Manufacturing of aerospace vehicles | The process with electroplating or spraying process and annual paint volume (containing diluent) at and more than 10 tons | Others | / | Engineering analysis and evaluation (Involving organic coatings (without powder spraying or plastic spraying) | |
77 | Manufacture of transportation equipment and other transportation equipment | The process with electroplating or spraying process and annual paint volume (containing diluent) at and more than 10 tons | Others (except for assembly only) | Assembly only | Engineering analysis and evaluation (Involving organic coatings (without powder spraying or plastic spraying) | |
XXVII. Electrical machinery and equipment manufacturing industry | ||||||
79 | Solar cell sheet | New construction and expansion of solar cell production; technical renovation of main installations, which results in an increase of 30% or more in scale | Others | / | ||
XXX. Comprehensive utilization of waste resources | ||||||
86 | Waste resources (including biomass) processing and recycling | New construction, expansion and technical renovation of main installations for the processing and recycling of waste electronic and electrical products, waste batteries, waste automobiles, waste motors, waste hardware, waste plastics (removal of sorting and cleaning process), waste oil and waste tyres | Others | / | ||
XXXI. Electricity, thermal production and supply industry | ||||||
90 | Biomass power generation | New construction, expansion and technical renovation of main installations for domestic waste and sludge incineration for power generation | Utilization of agroforestry biomass, biogas and landfill gas for power generation; Others | / | ||
92 | Thermal production and supply engineering (excluding electric heating boilers) | The total capacity of coal-fired and oil-fired boilers is more than 65 tons/hour (excluding); the total converted capacity of distributed energy supply project is equivalent to 65 tons/hour of boiler capacity (excluding) | Others (except for electric heating boilers and gas-fired boilers with a total capacity of 1 ton/hour and below) | Gas-fired boilers with a total capacity of 1 ton/hour and below | ||
XXXIII. Water production and supply industry | ||||||
97 | Industrial wastewater treatment | Centralized processing of new construction and expansion | Others | / | Water assessment (involving the discharge of Grade I pollutants) | |
XXXIV. Environmental governance industry | ||||||
100 | Utilization and disposal of hazardous wastes (including medical wastes) | Utilization and disposal (except for separate collection, corpse pits (wells) of sick and dead animals and pure physical disposal without sewage treatment engineering) of New construction, expansion and technical renovation of main installations | Others | / | ||
101 | Disposal and comprehensive utilization of general industrial solid waste (sludge) | New construction, expansion and technical renovation by means of landfill and incineration | Centralized disposal of construction waste; others | / | ||
XXXV. Public facility management industry | ||||||
104 | Centralized disposal of municipal domestic waste (including kitchen waste) | New construction, expansion and technical renovation of main installations | Others | / | ||
XXXVII. Research and experimental development | ||||||
107 | Professional laboratory | P3, P4 biosafety laboratory; GME laboratory | Involving biological and chemical reactions; involving environmentally sensitive areas | Others | All areas in provision 3 (1); basic farmland protected areas in provision 3 (2); all areas in provision 3 (3) | |
108 | R&D base | New construction, expansion and technical renovation of main installations of pilot testing in medicine, chemical engineering and other specialties | Wastewater, waste gas and solid waste from R&D Process (except for domestic sewage and garbage of R&D personnel) | Others | ||
XL. Social undertakings and service industries | ||||||
116 | Centralized laundry and tableware cleaning and disinfection in hotels, restaurants and medical institutions | / | Wastewater treatment facilities need to be built by oneself; tableware cleaning and laundry plant construction | Others | ||
XLIX. Transportation, pipeline transportation and warehousing | ||||||
157 | Grade highway (excluding maintenance, reconstruction and extension of Grade 4 highway) | Newly-built more than 30 km highways of grade 3 and above, newly-built tunnels covered 1-km and longer environmentally sensitive areas, and newly-built bridges with 1-km or longer main bridge in environmentally sensitive areas | Others (Except for supporting facilities and grade 4 highways not involving environmentally sensitive areas) | Supporting facilities, Grade 4 highways not involving environmental sensitive areas | All areas in provision 3 (1); all areas in provision 3 (2); all areas in provision 3 (3) | Noise assessment (Grade 3 and above and involving environmental sensitive areas in provision 3 (3) highway, tunnel and bridge) |
171 | Urban rail transit | Main facilities | Excluding the station construction in the main line; ancillary facilities such as parking lot, depot, fixed repair section, etc. | / | Noise assessment (involving environmental sensitive areas in provision 3 (3)) | |
172 | Urban road (excluding maintenance and branch) | / | Newly built expressways and trunk roads | Others | Noise assessment (secondary trunk roads and above involving environmental sensitive areas in provision 3 (3)) | |
173 | Urban bridges and tunnels (excluding footbridges and footpaths) | / | All | / | Noise assessment (involving environmental sensitive areas in provision 3 (3); atmospheric assessment (involving wind tower construction projects) | |
175 | Construction of urban pipeline network and corridor (excluding 1.6 MPa and below natural gas pipelines) | / | Newly built or additional land (including sewage pumping stations or combined rainwater and sewage pumping stations) | Others | ||
177 | Chemical pipeline | Chemical pipelines (excluding nitrogen and inert gases) | Nitrogen and inert gas pipeline | / | ||
180 | Warehouse (no oil depotgas depotcoal storage) | / | Warehousing, logistics and distribution projects of toxic, harmful and dangerous goods | / | Risk assessment |
Copied to: Environmental Protection Bureau of various districts, Beijing Economic-Technological Development Area Environmental Protection Bureau. Office of Beijing Municipal Bureau of Ecological Environment Printed and distributed on February 13, 2019 |
北京市生态环境局关于发布《〈建设项目环境影响评价分类管理名录〉北京市实施细化规定(2018版)》的公告